Fleetwood High School
Overview
The overall mission of the school is to provide the high quality education for its students, enabling them to achieve the best academic qualifications possible.
Fleetwood High School was originally built by Eric Wright Construction back in 2002; to accommodate more than 1400 pupils from the local area. Construction work compromised of a 10,500 sq m two storey building, with a fit out inclusive of all finishes, furniture, fixtures and equipment. A fully comprehensive mechanical and electrical service installation was also undertaken which included lifts and under-floor heating throughout the building.
Externally, in addition to the main drainage, car parking and landscaping, there is a large playing field, four tennis/netball courts and a 3G Astro pitch.
Our Services
EWFM was appointed, by Lancashire County Council in 2003, as part of the PFI scheme, to provide a Total FM package which included:
- 24/7 Service Desk
- Mechanical and electrical maintenance
- Heating, ventilation and air conditioning
- Lift maintenance
- Statutory testing
- Water hygiene management
- Maintenance of CCTV and intruder systems
- Grounds maintenance
- Maintenance of fire safety equipment
- Annual deep cleaning of school catering facilities
- Lifecycle management
Account Management
The account is supported by a dedicated facilities manager, together with assistance from our in-house EWFM authorised engineer, chartered building surveyor and energy manager.
On site, we currently employ three dedicated site supervisors who carry out all planned and reactive maintenance tasks on a day-to-day basis.